Image Slider

Our First Project: The Ensuite

On
Sunday, June 30, 2019



When we first moved into our home the first project we took on was the ensuite.

We hadn't realised when we'd viewed the house, but there was serious plumbing issues in the ensuite. The shower was very leaky and the previous owners had double siliconed around the base to account for all the water– not great!

To make matters worse, the shower pressure was so ridiculously low, it had to be 'enhanced' with an electric pump. The noise was insane!

The layout didn't utilise the space either. As you can see in the photos below, the door was in the centre of the room, dividing the space into two, with a sink on one side, and a toilet and shower squashed into the other.